Construction Cost Breakdown: The Pompano Beach Homeowner’s Reference for 2026
The gap between a Pompano Beach general contractor’s low bid and high bid on an identical 1,200-square-foot kitchen-and-bath renovation averaged $34,000 in 2024 - not because one contractor is dishonest, but because three line items (permit allowances, hurricane-rated window specs, and subcontractor markup structures) are priced radically differently depending on each contractor’s material relationships and overhead model. In this guide, we’ll unpack every major cost driver for residential construction in Pompano Beach in 2026, from framing per square foot to the hidden fees that appear after you’ve already signed. You’ll leave with line-item numbers you can screenshot, compare against any bid, and use to ask sharper questions before work starts.
Quick Answer
A complete residential construction project in Pompano Beach in 2026 typically runs 15-35% above national averages, with total costs driven by three stacked premiums: HVHZ-rated materials (12-18% upcharge), Broward County permit and inspection fees (published at BrowardCounty.gov), and coastal labor rates that sit above inland Florida norms. For a major renovation or addition, expect $180-$340 per square foot all-in at mid-grade finishes, with the lower end representing single-trade projects (roof replacement, window package) and the upper end representing whole-home gut renovations or second-story additions in beach-adjacent neighborhoods like Harbor Village or Garden Isles.
Table of Contents

- The HVHZ Premium: Why Pompano Beach Costs More Than Orlando
- Trade-by-Trade Cost Ranges for 2026
- Material Brand Pricing: What Specific Products Cost Installed
- Hidden Costs Most Bids Omit
- The True Cost of Change Orders
- Navigating Broward County Permits and Inspections
- How to Keep Your Budget Within 5% of the Agreed Number
- Common Mistakes to Avoid
Before
AfterThe HVHZ Premium: Why Pompano Beach Costs More Than Orlando
Pompano Beach sits in the High-Velocity Hurricane Zone (HVHZ), a designation that triggers the Florida Building Code’s most stringent material and installation requirements. This isn’t a marginal cost bump. It’s a structural price difference that affects every trade we perform at Rowan Construction Group Pompano Beach home, from roofing to window replacement to the structural connectors in a home addition.
Three drivers control the premium:
- HVHZ-rated material upcharges: Impact-rated windows, HVHZ-approved shingles, and reinforced garage doors carry 12-18% higher material costs than their standard counterparts. A standard vinyl window might run $380 installed; its PGT WinGuard impact-rated equivalent runs $520-$610 per opening in Pompano Beach, reflecting both the laminated glass and the structural reinforcement required for 140-mph wind loads.
- Broward County permit fee schedule: The county publishes its fee structure at BrowardCounty.gov, but the total outlay often surprises homeowners. A $75,000 kitchen renovation triggers permit fees of $850-$1,200, plus separate plumbing and electrical permits at $180-$350 each. Re-inspection fees add $75-$150 per trip if the initial inspection fails.
- Coastal labor market tightness: Skilled trades in Broward County command hourly rates 15-22% above inland Florida markets. A journeyman electrician in Ocala might bill $65/hour; in Pompano Beach, the same license holder bills $78-$92/hour, reflecting housing costs, commute patterns from western Broward, and consistent demand from both residential and commercial sectors.
We’ve delivered 4,000-plus projects since 2007, and the HVHZ premium is the single most common source of sticker shock for homeowners relocating from non-coastal markets. The number isn’t negotiable, but understanding it in advance prevents the budget drift that derails projects.
Trade-by-Trade Cost Ranges for 2026

Below are installed cost ranges for Pompano Beach in 2026 dollars. “Installed” means materials, labor, basic demolition, and standard disposal. It does not include permit fees, design services, or premium finishes unless noted.
Structural and Framing
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| Wood framing, new construction or addition | $28/sq ft | $38/sq ft | $52/sq ft | Engineered lumber vs. standard SPF; second-story vs. slab-on-grade; complexity of roofline |
| Structural steel beam (replace load-bearing wall) | $3,200 | $4,800 | $7,500 | Beam span, access for crane or manual placement, fireproofing requirements |
| Concrete foundation, monolithic slab | $7/sq ft | $10/sq ft | $14/sq ft | Soil conditions; need for engineered fill in coastal sand; vapor barrier spec |
Roofing (Complete Tear-off and Replacement)
| Material | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| GAF Timberline HDZ (HVHZ-approved shingle) | $4.80/sq ft | $5.60/sq ft | $6.80/sq ft | Roof pitch, deck condition, dormer count, accessibility |
| Owens Corning Duration (HVHZ-approved shingle) | $5.00/sq ft | $5.80/sq ft | $7.00/sq ft | Same; OC carries slight premium in South Florida market |
| Barrel tile (clay or concrete) | $9.50/sq ft | $12.00/sq ft | $16.00/sq ft | Tile weight requiring structural reinforcement; underlayment upgrade to double-layer |
| Standing-seam metal (aluminum or steel) | $11.00/sq ft | $14.50/sq ft | $19.00/sq ft | Metal gauge (24 ga. vs. 26 ga.), Kynar finish vs. painted, complexity of transitions |
| Modified bitumen (flat/low-slope) | $6.50/sq ft | $8.50/sq ft | $11.00/sq ft | Insulation R-value requirement, tapered crickets for drainage, parapet detail |
For roofing specifically, we’ve found that homeowners in neighborhoods like Collier Manor and Cresthaven often discover latent deck damage once tear-off begins. We budget $2-$4 per square foot for plywood deck replacement, and we write it into the scope as a line item with a unit price - not a surprise. Under Clause 1 of the Haven Standard, that number is in writing before anyone starts.
Electrical
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| Panel upgrade, 200A service | $2,800 | $3,800 | $5,200 | Underground vs. overhead service, meter location, FPL coordination timeline |
| Panel upgrade, 400A service | $5,500 | $7,500 | $10,000 | Dual-panel configuration, trenching for new service lateral |
| Rough-in, new circuit (per circuit) | $280 | $380 | $520 | Wall accessibility (fishing vs. open framing), AFCI/GFCI requirements by code cycle |
| Fixture installation (per fixture, owner-provided) | $85 | $140 | $220 | Ceiling height, fixture weight requiring support box, smart-switch integration |
Plumbing
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| Fixture rough-in (toilet, sink, tub) | $450 | $650 | $950 | Slab vs. raised floor, cast iron vs. PVC replacement, access difficulty |
| Tankless water heater install | $2,800 | $3,800 | $5,200 | Gas line sizing, venting configuration, condensing vs. non-condensing unit |
| Whole-house repipe (CPVC or PEX) | $4,500 | $7,500 | $12,000 | House size, number of stories, drywall repair scope |
HVAC
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| Split system, 3-ton (replacement) | $5,800 | $7,200 | $9,500 | SEER2 rating (14.3 vs. 16+), ductwork condition, line set replacement |
| Split system, 5-ton (replacement) | $7,500 | $9,800 | $13,000 | Same; larger units require dedicated electrical runs more often |
| Ductwork replacement (per square foot of home) | $6.50 | $9.00 | $12.50 | Attic vs. crawlspace access, flex duct vs. rigid metal, zoning controls |
Carrier and Lennox both maintain strong distribution in Broward County. At the 3-ton tier, we’ve found Carrier’s Comfort series and Lennox’s Merit series land within $400 of each other installed; the gap widens at 5 tons where Lennox’s variable-capacity XC25 commands a premium for its inverter-driven compressor.
Kitchen and Bathroom (Full Renovation)
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| Kitchen renovation, minor (cabinets, counters, paint) | $18,000 | $28,000 | $42,000 | Cabinet line (stock vs. semi-custom), countertop material, appliance package |
| Kitchen renovation, major (gut, reconfigure, appliances) | $45,000 | $72,000 | $110,000 | Structural wall removal, plumbing relocation, custom cabinetry, premium appliances |
| Bathroom renovation, hall bath | $12,000 | $19,000 | $28,000 | Shower/tub configuration, tile grade, vanity source |
| Bathroom renovation, primary suite | $28,000 | $45,000 | $75,000 | Freestanding tub, curbless shower with linear drain, heated floor, custom vanity |
For Kitchen Remodeling in Pompano Beach, our quotes specify cabinet brand and line (KraftMaid’s Vantage vs. Wellborn’s Estate series, for example), countertop material and thickness (Cambria’s 3cm quartz vs. Caesarstone’s 2cm with mitered edge), and a written appliance allowance. This specificity is what keeps our projects within a few percent of the agreed number.
Windows, Doors, and Exterior
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| PGT WinGuard impact window (per sq ft installed) | $52 | $58 | $72 | Fixed vs. operable, size, grid pattern, finish (white vs. bronze vs. custom) |
| Entry door, fiberglass, impact-rated | $2,800 | $4,200 | $6,500 | Size (standard 3/0 vs. 8/0), sidelight configuration, hardware grade |
| Sliding glass door, impact-rated, 8 ft | $3,200 | $4,500 | $6,800 | Lift-slide vs. standard, multi-point lock, screen type |
Hardscaping and Site
| Item | Low Range | Mid Range | High Range | Variable That Moves the Number |
|---|---|---|---|---|
| Concrete driveway, 4-inch, standard broom | $7.50/sq ft | $9.50/sq ft | $12.00/sq ft | Reinforcement (wire mesh vs. rebar), expansion joint spacing, removal of existing |
| Belgard pavers, standard installation | $14.00/sq ft | $18.00/sq ft | $24.00/sq ft | Edge restraint type, bedding sand depth, pattern complexity |
| Techo-Bloc pavers, premium line | $18.00/sq ft | $23.00/sq ft | $30.00/sq ft | Same, plus permeable base system if required for drainage code |
| Vinyl privacy fence, 6 ft | $28/linear ft | $36/linear ft | $48/linear ft | Post depth in sandy soil, wind-load engineering for HVHZ, gate hardware |
Material Brand Pricing: What Specific Products Cost Installed
Generic labels like “architectural shingles” or “quartz countertop” obscure $3,000-$8,000 swings in real project costs. Below are installed price ranges for specific brands we specify in our written quotes.
Roofing Shingles
GAF Timberline HDZ (HVHZ-approved): $4.80-$6.80 per square foot installed. The HDZ uses LayerLock technology and qualifies for GAF’s WindProven limited wind warranty when installed with four required accessories. In Pompano Beach, we specify the full accessory package - Cobra ridge vent, Tiger Paw underlayment, WeatherWatch leak barrier - because partial accessory packages void the enhanced warranty and leave the homeowner exposed.
Owens Corning Duration (HVHZ-approved): $5.00-$7.00 per square foot installed. The SureNail strip provides a wider nailing zone, which we’ve found reduces installation error rates in high-wind applications. OC carries a slight South Florida market premium due to distribution patterns.
IKO Cambridge (where HVHZ-approved): $4.50-$6.20 per square foot installed. IKO’s heavyweight laminate construction performs well in coastal wind zones, though availability in Broward County fluctuates more than GAF or OC.
Atlas StormMaster Slate (impact-resistant): $6.50-$8.50 per square foot installed. The polymer-modified asphalt core resists hail and wind-driven debris; we specify this in neighborhoods with mature banyan or oak canopy where branch strike is a real risk.
Tamko Heritage (where HVHZ-approved): $4.20-$5.80 per square foot installed. Tamko’s price position makes it attractive for rental properties or flips, though color availability in South Florida is narrower than GAF or OC.
Cabinetry and Countertops
KraftMaid Vantage (semi-custom): $380-$520 per linear foot installed, including hardware and basic crown. Upgrades to Vantage Plus (dovetail drawers, soft-close) add $45-$65 per linear foot.
Wellborn Estate (semi-custom): $420-$580 per linear foot installed. Wellborn’s frameless construction yields slightly more interior volume per cabinet; we note this in our quotes when storage efficiency matters.
Cambria quartz (3cm, standard edge): $75-$110 per square foot installed. Cambria is manufactured in the U.S. and carries consistent lead times, which matters in Pompano Beach where port delays have affected imported stone.
Caesarstone quartz (3cm, standard edge): $68-$98 per square foot installed. Caesarstone’s Supernatural series commands the upper end; their standard colors compete on price with mid-grade granite.
Plumbing Fixtures
Kohler (widespread lavatory faucet): $280-$450 installed. Kohler’s ceramic disc cartridges carry a lifetime finish warranty; we document the model number in our photo record for warranty registration.
Toto (Drake II elongated, comfort height): $520-$680 installed. The Toto’s 1.28 GPF flush performs reliably in Broward County’s water pressure range, which varies by neighborhood and time of day.
Hidden Costs Most Bids Omit

These are not contingency items. They are predictable, documentable costs that many contractors bury in “allowances” or omit entirely, surfacing them only when the homeowner is financially committed.
- Notice of Commencement recording: $10-$30 filing fee at the Broward County Clerk, plus $150-$400 if attorney preparation is required for complex ownership structures (trusts, LLC-held properties, estates). Lenders increasingly require NOC recording for projects exceeding $5,000.
- Dumpster permits in Pompano Beach city limits: $75-$150 per placement, per 30-day period. Beach-adjacent neighborhoods and HOA-governed communities like Palm Aire often restrict dumpster placement to specific hours or locations, requiring multiple permits or smaller containers at higher per-ton cost.
- Flood elevation certificate: $450-$850 if the property is in a FEMA AE zone and no current certificate exists on file. Many Pompano Beach homes built before 1992 lack digital elevation records. The certificate is required for permit approval on any addition or substantial improvement; it’s not optional.
- Tree protection bond: $500-$2,000 refundable deposit if protected species are present on or near the site. Pompano Beach’s tree preservation ordinance covers live oaks, gumbo limbo, and certain palms; removal or encroachment requires arborist approval and bonding.
- Utility locate and temporary service: $150-$350 for private utility locating (Sunshine 811 covers public lines only); $200-$500 for temporary electrical service during panel upgrades or whole-home rewires.
- Post-construction cleaning: $450-$950 for professional cleaning after major renovation. We include this as a line item because “broom clean” in a contract means different things to different people, and the Haven Standard specifies deliverables, not assumptions.
Our written quotes itemize each of these when applicable. The customer sees the full stack before signing, not after.
The True Cost of Change Orders
Change orders are not inherently bad. They are how a project adapts to discovered conditions or evolving preferences. The problem is unsigned verbal changes, which breed dispute and budget drift.
In a well-run general contracting operation, a signed change order carries $150-$400 in administrative overhead: revised scope documentation, subcontractor re-pricing, permit amendment if required, schedule adjustment, and updated insurance certificates. This is legitimate cost. We absorb this overhead into our process because it prevents the far larger cost of dispute.
Here’s what an unsigned verbal change costs when it reaches Broward County’s contractor mediation process:
- Mediation filing fee: $300-$500
- Attorney preparation for informal hearing: $1,500-$4,000
- Delay costs (crew standby, material storage, extended equipment rental): $800-$2,500 per week
- Relationship fracture: often unrecoverable, leading to separate litigation or bonded claim
We’ve seen $12,000 kitchen additions generate $8,000 in dispute costs over a $1,200 verbal change that wasn’t documented. Under the Haven Standard, no work proceeds on a change until the change order is signed. This administrative discipline, acquired by Haven when they brought Rowan into their operating system, is why our projects finish within a few percent of the agreed price.
The signed change order is not bureaucracy. It’s the documentation that protects both parties.
Navigating Broward County Permits and Inspections

Broward County’s permitting operates through the Building Code Division, with satellite offices in Fort Lauderdale and online submission through the ePermits portal. For Pompano Beach homeowners, Construction Permits, Codes & Inspections in FL: What You Need to Know is worth reviewing before budgeting timeline or cost.
- Plan review timeline: 10-20 business days for residential projects under $100,000; 20-35 days for additions, ADUs, or projects requiring structural engineering. Expedited review is available for 150% of standard fees, typically cutting timeline by 40%.
- Inspection scheduling: Online or by phone; same-day or next-day availability for most trades, though roofing and structural inspections often book 3-5 days out during peak season (March-June, post-winter storm repair demand).
- Re-inspection fees: $75-$150 per re-inspection if the initial inspection fails. Common failure points in Pompano Beach: inadequate hurricane strap documentation on framing inspections, missing or incomplete impact product approval numbers on window/door inspections, and insufficient slope on flat roof sections.
- Certificate of Occupancy or Completion: Required for additions, ADUs, and any project creating new conditioned space. Final CO inspection includes verification of all trade permits, final survey if setback was affected, and flood elevation compliance for AE zone properties.
We pull all permits as part of our scope and include the fees in our written quote. The customer receives permit application numbers and inspection schedules in our project documentation portal. This transparency is standard, not optional.
How to Keep Your Budget Within 5% of the Agreed Number
After 4,000-plus projects, we’ve identified five practices that separate projects that finish on budget from those that drift 15-30% over:
- Demand line-item pricing with unit costs. “Kitchen renovation: $65,000” is not a quote; it’s a guess. A real quote breaks out cabinets, countertops, appliances, electrical, plumbing, flooring, paint, and permits as separate line items with unit costs where applicable ($/linear foot for cabinets, $/square foot for flooring). This lets you compare apples-to-apples and spot omissions.
- Verify the allowance structure. Allowances are placeholders for owner selections not yet made. A $4,000 tile allowance in a primary bathroom is adequate for mid-grade porcelain; it’s inadequate for imported stone or large-format rectified tile with specialized installation. Ask what specific product the allowance assumes, then adjust before signing.
- Require a written change order protocol. The contract should specify: who can authorize changes, the maximum dollar threshold for verbal approval (we set this at $0), the form the change order takes, and the timeline for pricing and signature. Under Clause 1 of the Haven Standard, the price is written before anyone starts; under our change order protocol, the revised price is written before any changed work proceeds.
- Document existing conditions. The photo record we provide on every visit includes pre-construction documentation of walls, floors, ceilings, and adjacent finishes. This protects both parties: the homeowner can’t be charged for pre-existing damage, and the contractor can’t be blamed for conditions that existed before arrival.
- Schedule a pre-drywall walkthrough. For additions and major renovations, inspecting framing, plumbing, electrical, and HVAC before drywall closes the walls lets you confirm locations and catch errors when they’re $50 fixes, not $2,000 demolition-and-rebuilds.
Our Bathroom Remodeling in Pompano Beach quotes include these five practices as standard deliverables, not upgrades. The written price you receive includes the documentation protocol, the photo record, and the change order discipline.
Common Mistakes to Avoid

- Comparing bids with different scopes. One contractor’s $48,000 kitchen bid includes cabinet installation only; another’s $62,000 bid includes cabinets, countertops, backsplash, and appliance installation. The lower bid isn’t cheaper; it’s smaller. We provide a free second opinion on any written estimate, reviewing line by line to identify scope gaps.
- Ignoring the HVHZ material specification. A standard window or non-impact door installed in Pompano Beach violates code and voids insurance coverage. Verify that every exterior product carries a Florida Product Approval or Miami-Dade Notice of Acceptance (NOA) number; we list these on every quote.
- Accepting “time and materials” for fixed-scope work. Time and materials has its place in repair work with unknown conditions. For defined-scope projects like Roofing in Pompano Beach or a kitchen renovation, it transfers all cost risk to the homeowner with no corresponding benefit. We quote flat prices with written scopes.
- Neglecting the flood zone check. Pompano Beach’s FEMA flood maps were updated in 2023; properties previously in Zone X are now in Zone AE, triggering elevation certificate and construction requirements that add $2,000-$5,000 to addition and ADU projects. Verify your current zone at msc.fema.gov before budgeting.
- Skipping the permit cost in early budgeting. Broward County permit fees for a $100,000 addition run $2,200-$3,500 including plan review, inspections, and CO. Contractors who omit this in early conversations are either inexperienced or deliberately lowballing to secure engagement.
- Assuming “licensed and insured” means adequately insured. Ask for certificate of insurance showing general liability ($1M per occurrence minimum), workers’ compensation (required in Florida for construction with employees), and completed operations coverage. We provide this on request before any agreement.
- Failing to budget for temporary relocation. A whole-home renovation or major addition may require 2-6 months of alternate housing. In Pompano Beach’s seasonal rental market, this runs $2,500-$5,500 monthly for comparable space. Budget it upfront or phase the project to maintain occupancy.
When to Call a Professional
Call a licensed general contractor when your project involves structural modification, electrical panel work, plumbing relocation, or any work requiring a permit - our DIY vs Professional Construction: The Pompano Beach Homeowner’s Decision Guide can help you decide. In Pompano Beach, this covers virtually every project beyond cosmetic painting and flooring replacement. The Florida Building Code’s HVHZ requirements mean that even seemingly simple projects - replacing windows, re-roofing, installing a new entry door - require product approvals and permit documentation that homeowners cannot self-verify.
Rowan Construction Group Pompano Beach offers free estimates in Pompano Beach. Every estimate is a written, line-item, flat price delivered before any work starts, backed by our 365-Day Done Right Promise and the administrative discipline of the Haven Standard. Call (754) 714-6540 to schedule yours, or bring a competitor’s written quote for our free second-opinion review.
Frequently Asked Questions

A home addition in Pompano Beach in 2026 typically runs $220-$340 per square foot at mid-grade finishes, with the lower end representing simple slab-on-grade room additions and the upper end representing second-story construction with structural reinforcement and HVHZ-rated windows and doors. The Pompano Beach premium over national averages is 18-25% for additions due to foundation requirements in coastal sand, HVHZ structural connectors, and the flood elevation documentation required in FEMA AE zones. Call (754) 714-6540 for an exact quote on your specific footprint - estimates are free.
Roofing bids vary because contractors price three hidden variables differently: deck replacement assumptions (some assume full replacement, others assume spot repair), accessory package completeness (ridge vent, underlayment, leak barrier required for warranty vs. omitted for low bid), and labor classification (W-2 employees with workers’ comp vs. 1099 subcontractors without). A $14,000 bid and a $22,000 bid for the same 2,500-square-foot roof often reflect real differences in deliverables, not markup greed - see our Construction Warning Signs: A Pompano Beach Homeowner’s Reference Guide for what to watch for. Ask for the shingle brand and line, the accessory list, and the deck replacement unit price.
Our price does not change unless the scope changes, and no scope change proceeds without a signed change order. This is Clause 1 discipline of the Haven Standard, and it’s why our projects finish within a few percent of the agreed number. The only exceptions are concealed conditions that no reasonable inspection could reveal - termite damage behind finished walls, for example - and even these are documented with photos and priced at unit rates established in the original contract. Call (754) 714-6540 to review how we handle concealed conditions in our written agreements.
We pull all permits as part of our scope. The homeowner receives permit application numbers, inspection schedules, and final approval documentation through our project portal. This is included, not optional, because permit coordination is integral to schedule control and code compliance. In Broward County, owner-pulled permits on contractor-managed projects create liability gaps that neither party wants.
A minor kitchen renovation (cabinets, counters, appliances, no structural change) takes 4-6 weeks from demolition to final inspection. A major renovation with wall removal, plumbing relocation, and electrical panel work takes 8-14 weeks, with permit review adding 2-3 weeks before demolition starts. Pompano Beach’s peak season (March-June) extends subcontractor availability by 1-2 weeks; we build this into our schedules and communicate it upfront. The written quote includes a timeline with milestones, not just a completion date.
An ADU (Accessory Dwelling Unit) is a separate, independent living unit with its own kitchen, bathroom, sleeping area, and exterior entrance, legally rentable under Florida law. An in-law suite is typically a bedroom and bathroom within or attached to the main house, sharing kitchen facilities and not separately rentable. ADUs require full permitting as dwelling units, including separate utility connections or sub-meters, dedicated parking, and compliance with setback and lot coverage rules. In Pompano Beach, ADU feasibility depends on your zoning district and lot size; we verify both before quoting. Call (754) 714-6540 to assess your property’s ADU potential.
The Bottom Line
Construction costs in Pompano Beach in 2026 are knowable, documentable, and controllable - but only if you understand the stacked premiums that make this market different from inland Florida. The HVHZ material upcharge, Broward County’s permit structure, and coastal labor rates are not negotiable, but they are predictable. The real budget killers are concealed conditions, unsigned changes, and bids that omit line items you’ll pay for later. Demand written specificity: brand names, unit prices, permit fees, and a change order protocol. Browse our more guides & resources to sharpen your project planning. The contractor who puts the full stack in writing before work starts is the contractor who finishes within a few percent of the number you agreed to.
Written by Grant Rowan, Owner at Rowan Construction Group Pompano Beach, serving Pompano Beach since 2007.