Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Driveway & Pavers: The Pompano Beach Owner’s Guide
KraftMaid driveway and paver components in Pompano Beach typically run $7,000-$18,000 for full paver driveway installation, and we stock KraftMaid-compatible edge restraints, permeable joint spacers, and transition strips for same-day replacement on most series. Most owners realize something’s wrong when the paver border along their KraftMaid-designed driveway starts lifting after heavy rain, or when the sand bed beneath shows through in the ruts where tires track every morning.
We’ve replaced more of these in Pompano Beach than we can count, particularly along the older subdivisions near Atlantic Boulevard where the original KraftMaid installations from the mid-2000s are hitting the 15-20 year mark on their base layers. The symptom picture is usually the same: a few pavers rock underfoot, then water pools where it didn’t before, then the edge restraint pops and the whole border starts wandering. Measure twice, say it once, show your work - that’s how we approach every KraftMaid paver repair we quote.
Which KraftMaid Models This Applies To
KraftMaid doesn’t manufacture pavers directly; they specify Belgard, Techo-Bloc, and select regional quarry products through their design partners, then warrant the finished installation through their dealer network. What we’re servicing in Pompano Beach are the KraftMaid-specified installations - the ones sold through their authorized dealers with KraftMaid-branded design documentation and, in some cases, KraftMaid warranty cards filed at closing.
To identify your series, check the project folder from your original purchase. KraftMaid driveway jobs from 2008-2016 typically specified Belgard Dublin Cobble in 60mm thickness with a concrete edge restraint; 2017 onward shifted toward Techo-Bloc Antika or Blu 80mm with aluminum or PVC restraint systems. The compatibility gotcha is the joint spacing: early KraftMaid specs called for 1/8″ joints with polymeric sand, while current specs use 3/16″ with permeable joint material. Drop the wrong sand into a 1/8″ joint and it won’t set properly; we’ve cleaned that mistake out of three Pompano Beach driveways in the last two years.
OEM part versus quality aftermarket: KraftMaid dealers stock replacement pavers by the pallet, but lead time is typically 3-4 weeks for discontinued colors. We source color-matched equivalents from the same quarries - Belgard’s Bristol Valley in the Sierra colorway, for instance, matches most 2012-2015 KraftMaid specs without the dealer markup. We document the source on every quote, so you know exactly what you’re getting.
Signs Your KraftMaid Driveway & Pavers Is Failing

- Pavers rock or sink under tire weight. The bedding sand beneath has washed out or compacted unevenly, often because the joint sand failed and let water migrate downward. In Pompano Beach’s sandy soil, this happens faster than in clay-heavy regions because the water drains straight through instead of pooling.
- White haze or efflorescence on paver faces. Calcium salts from the bedding layer or base concrete are migrating to the surface through capillary action. It’s not just cosmetic; it signals moisture is moving through the assembly in ways the original design didn’t intend, and the base may be degrading.
- Edge restraints pulling away from the border course. The spikes have corroded (common with early KraftMaid specs that used uncoated steel) or the PVC has cracked in UV exposure. Once the edge goes, the field pavers lose lateral support and the whole installation starts spreading.
- Weeds growing through joint sand within a year of re-sanding. The polymeric sand didn’t cure properly, usually because it was installed on damp substrate or swept in during Pompano Beach’s afternoon rain pattern. Live joint material is the fix, not more of the same failed product.
- Standing water 30 minutes after rain ends. The base slope has settled or the permeable joint material has clogged with organic debris. In Florida’s afternoon thunderstorm cycle, this accelerates subbase erosion and will collapse the installation if ignored.
Before
AfterReplacement Cost & What’s Included
| Service | Price Range in Pompano Beach |
|---|---|
| Paver driveway installation (new, KraftMaid-specified) | $7,000 - $18,000 |
| Concrete driveway installation | $4,500 - $12,000 |
| Asphalt driveway paving | $3,500 - $9,000 |
| Driveway replacement (remove and reinstall) | $5,000 - $14,000 |
| Driveway sealing | $250 - $700 |
| Paver patio installation | $3,500 - $11,000 |
| Sectional paver repair (edge restraint + 50-100 sq ft) | $1,200 - $3,500 |
| Joint sand replacement (full driveway) | $800 - $2,200 |
What drives the range: access for excavation equipment, whether the existing base is salvageable, and paver availability. A 2014 KraftMaid spec in a discontinued color might require us to source from a secondary dealer in Fort Lauderdale or recommend a close match with your approval. Under Clause 1 of the Haven Standard, the price we write is the price you pay - no change order gets signed without your initials, and no work proceeds on a change until it is.
Every paver job includes a documented photo record of the excavated base condition, the compaction test results, and the finished surface. The 365-Day Done Right Promise covers settling, joint failure, and edge restraint separation. We also source parts for Cambria, Silestone, and Kohler products when your KraftMaid project includes integrated outdoor kitchen or bath elements.
DIY or Call Us?

What you can safely check yourself: lift a loose paver and look at the bedding sand. If it’s gray and granular, the base is probably intact. If it’s muddy, washed out, or missing entirely, you’ve got a drainage or base problem that goes deeper than the surface.
Where DIY goes wrong: resetting pavers without recompacting the bedding layer leaves voids that collect water and fail again in six months. Cutting edge restraints with a miter saw without dust collection exposes you to PVC or aluminum particulate. And the polymeric sand that works in Arizona will not cure in Pompano Beach’s humidity - we’ve pulled failed DIY joint repairs from a dozen driveways where the homeowner followed a YouTube video shot in a dry climate.
We’re not affiliated with KraftMaid Corporation; we’re an independent service provider with fifteen years of documented installations and repairs on their specified systems. If your driveway is showing any of the symptoms above, call (754) 714-6540 to schedule your free estimate. We’ll give you a written price before anyone picks up a tool, and we’ll show you exactly what we found with a photo record you can keep.
FAQs
20-30 years for the pavers themselves, 10-15 years for the joint material and edge restraints before maintenance is required. Florida’s UV exposure and salt air accelerate PVC edge restraint brittleness, and our afternoon rain pattern works polymeric sand harder than in drier climates. Call (754) 714-6540 for an exact quote on your remaining service life - estimates are free.
Yes, if the base is intact and the failure is localized to edge restraints, joint sand, or under 15% of the paver field. We cut out the failed section, recompact the base, and reinstall with color-matched material. If the base has settled or washed out across more than 20% of the area, replacement is more economical than patchwork. We document both options in writing before you decide.
Sectional repairs: 1-2 days. Full driveway replacement: 3-5 days including base preparation and compaction cure time. We sequence our crews so no job sits idle waiting on material or equipment - Grant Rowan built our scheduling system on that principle after too many years watching other contractors lose weeks to poor coordination.
We stock Belgard and Techo-Bloc edge restraints in aluminum and PVC, permeable joint sand, and base material on every paver truck. Specific paver colors and sizes are ordered to match your existing field, with 24-48 hour availability for current production lines and 1-2 weeks for discontinued series. We confirm stock status during your estimate, not after you’ve signed.
Written by Grant Rowan, Owner, Rowan Construction Group Pompano Beach at Rowan Construction Group Pompano Beach, serving Pompano Beach and nearby areas.







Before
After
Before
After
Before
After