A Rowan company - serving Pompano Beach, FL

Before & After Gallery - Rowan Construction Group Pompano Beach

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Construction Before & After in Pompano Beach, FL

Photos don’t exaggerate. A kitchen with 1980s laminate and a kitchen with KraftMaid dove-gray cabinets and Cambria quartz are two different rooms, and the camera shows exactly which one we built. Below are recent transformations we’ve completed across Pompano Beach. Each entry includes the condition we found, the scope we quoted, and the finished result. Every job started with a written flat price under Clause 1 of the Haven Standard and ended with a documented photo record of what was done.

Call (754) 714-6540

Recent Transformations

Kitchen Remodel: Galley Layout with Water-Damaged Subfloor in Cypress Bend

Before: galley kitchen with swollen particleboard subfloor and original 1992 cabinetry
Before: Kitchen with failed subfloor, original builder-grade cabinets, and no workable counter space
After: expanded galley with KraftMaid soft-close cabinets and Cambria Brittanicca quartz counters
After: Expanded galley with KraftMaid soft-close cabinetry, Cambria Brittanicca quartz, and new plywood subfloor

The particleboard subfloor in this Cypress Bend galley had swollen where the dishwasher valve leaked for what looked like years. We pulled everything to the studs, replaced the subfloor with exterior-grade plywood, and reconfigured the layout to add eight linear feet of counter space. The homeowner chose KraftMaid’s Brellin style in mineral paint and Cambria Brittanicca quartz with a waterfall edge on the peninsula. We quoted $34,800 in writing before anyone touched a cabinet; the final invoice was $35,200 after the homeowner added under-cabinet lighting mid-project, signed change order included. The photo record shows the subfloor rot, the new framing, and every layer in between.

Bathroom Remodel: Failed Shower Pan and Mold Behind Tile in Palm Aire

Before: shower with cracked mud bed, missing grout, and visible mold on greenboard
Before: Shower with failed mud-bed pan, mold on greenboard, and no waterproofing membrane
After: curbless walk-in shower with Kohler Purist fixtures and Toto Washlet bidet toilet
After: Curbless walk-in with Schluter-Kerdi membrane, Kohler Purist fixtures, and Toto Washlet bidet toilet

The mud-bed shower pan in this Palm Aire master bath had cracked through, and water had been running behind the greenboard for long enough to stain the stud bay. We stripped to framing, found two studs with surface mold, treated and sistered them, and built a proper Schluter-Kerdi waterproofing system with a linear drain for a curbless entry. The homeowner wanted aging-in-place access without the institutional look, so we specified Kohler Purist in brushed nickel and a Toto Washlet bidet toilet. Written quote was $18,400; we held to it exactly. The photo record includes the exposed framing with mold treatment tags, the membrane installation, and the flood test.

Roof Replacement: Three-Tab Shingles at End of Life with Active Leaks in Harbor Village

Before: 22-year-old three-tab shingles with cupping, granule loss, and two active leak points
Before: 22-year-old three-tab shingles with cupping, bare fiberglass showing, and active leaks at valley and vent
After: GAF Timberline HDZ architectural shingles with new synthetic underlayment and drip edge
After: GAF Timberline HDZ architectural shingles with synthetic underlayment, ice-and-water shield at valleys, and new drip edge

This Harbor Village roof had 22-year-old three-tab shingles that were cupping so badly the fiberglass mat showed through in patches. Two leaks were active during the September rains, one at a valley and one where a bathroom vent flange had cracked. We stripped to deck, found one 4×8 plywood section with delamination, replaced it, and installed GAF Timberline HDZ in Barkwood with synthetic underlayment and ice-and-water shield at all valleys and penetrations. The written quote was $14,200; no changes, no surprises. The photo record shows the bare fiberglass patches, the delaminated deck section, and the finished ridge vent detail.

Home Addition: Master Suite Above Garage with Structural Beam in Garden Isles

Before: two-car garage with standard truss roof and no second-floor access
Before: Two-car garage with standard truss roof, no second-floor access, and 4-inch slab with no footing for load-bearing wall
After: 420-square-foot master suite with vaulted ceiling, walk-in closet, and en-suite bath
After: 420-square-foot master suite with engineered beam vault, walk-in closet, and full bath with curbless shower

This Garden Isles homeowner needed a master suite and had no place to build but above the garage. The existing truss roof had to come off, and the 4-inch garage slab had no footing for a load-bearing wall. We engineered a 24-foot LVL beam to carry the new floor load, poured a grade beam with rebar and J-bolts, and framed a 420-square-foot suite with a vaulted ceiling and dormer. The en-suite bath includes a curbless shower and a stacked washer-dryer closet. We quoted $87,500 in writing, broke it into four draw milestones, and finished at $88,900 after the homeowner signed a change order to upgrade from vinyl to Andersen 400 Series windows. Permits were pulled, inspections passed, and the photo record runs 340 images from footing to final paint.

Driveway & Pavers: Cracked Concrete with Poor Drainage in Collier Manor

Before: 30-year-old concrete driveway with settlement cracks and water pooling at garage threshold
Before: 30-year-old concrete driveway with settlement cracks, reverse grade toward garage, and standing water after every rain
After: Belgard Dublin Cobble pavers in Fossil Beige with channel drain and proper slope to street
After: Belgard Dublin Cobble pavers in Fossil Beige with channel drain, 6-inch base, and 1.5% slope to street

The concrete in this Collier Manor driveway had settled toward the garage, so every rain sent water pooling at the threshold and under the door. We removed the slab, excavated 12 inches, and built a 6-inch compacted limestone base with geo-grid. Belgard Dublin Cobble in Fossil Beige went down with a channel drain at the garage entry and a 1.5% slope to the street. The written quote was $11,600; we hit it exactly. The photo record shows the reverse grade before excavation, the base lift thickness, and the laser-level slope verification.

Windows & Doors: Single-Pane Aluminum with Failed Seals in Pompano Beach Highlands

Before: original 1978 single-pane aluminum windows with failed rollers and fogged sliding door glass
Before: 1978 single-pane aluminum windows with failed rollers, missing weatherstrip, and fogged insulated glass in sliding door
After: impact-rated vinyl windows with low-E glass and new fiberglass entry door with multipoint lock
After: Impact-rated vinyl windows with low-E glass, argon fill, and new fiberglass entry door with multipoint lock

This Pompano Beach Highlands home still had its original 1978 single-pane aluminum windows. The rollers had failed on three sliders, the weatherstrip was crumbling, and the insulated glass in the patio door had fogged through. We specified impact-rated vinyl with low-E glass and argon fill for the twelve openings, plus a fiberglass entry door with a multipoint lock. The written quote was $13,800; no change orders. The photo record shows the failed rollers, the fogged IG unit, and the installation of the new door with the multipoint hardware engaged.

Want Results Like These?

Two contractors installing wooden kitchen cabinets on a construction site
Want Results Like These?

Every project above started the same way: a phone call to (754) 714-6540, a site visit, and a written flat price with scope and warranty before any work began. Under Clause 1 of the Haven Standard, that’s the only way we operate. Bring us any competitor’s written estimate and we’ll review it line by line at no charge. Call (754) 714-6540 to schedule your free estimate in Pompano Beach.

Written by Grant Rowan, Owner at Rowan Construction Group Pompano Beach, serving Pompano Beach since 2007.

Need Construction help in Pompano Beach? Licensed & insured · Free written quotes response · free estimates
Call (754) 714-6540
Local Service Coverage

Request a Free Estimate in Pompano Beach

Tell us what you need - Rowan Construction Group Pompano Beach responds fast. No obligation.

By clicking submit, you accept our Privacy Policy and consent to being contacted by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch